Work Scope: Covering facade with creamy and brown decorative sinterflex stone and decorative aluminum profiles. Application of silicone front system in the glazing of building itself and checkpoint. Installation of glass fringe with spider system, rustless columns and internal partitions in the interior.
Dates | 01.09.2014 – 20.11.2014 |
Architect | Elmir Huseynov |